架构师_程序员_码农网

Retrieve password
Register

QQ登录

Just one step to get started

Search
View:8139|Reply: 0
打印 上一主题 下一主题

[Network Management]RG-SMP Network Security Management Platform Server Hardware Preparation

[Copy Link]
跳转到指定楼层
owner of the building
发表于 2014-10-24 17:26:12| 看该作者回帖奖励|ReverseBrowse|Read Mode
Hardware preparation: including server hardware and SMP system dongle.
I. Server Hardware Preparation
SMP system involves customer business network operations, so the installation of SMP system server hardware must meet the minimum system configuration requirements, otherwise there will be problems such as slow authentication, high server CPU usage, slow access to the management page, etc. It is recommended to use the recommended configuration
Minimum configuration:
Dell PowerEdge R710
CPU: Intel Xeon E5606 2.13GHz 4-core*2
Memory: 4G
Disk: 130MB throughput rate, 100G and above capacity
Network: 1000Mbps full duplex NIC*3
Recommended Configuration:
Dell PowerEdge R710
CPU: Intel Xeon E5630 2.53GHz 4-core*4
Memory: 16G
Disk: Throughput rate of 266MB and above, 200G and above capacity, 500G is recommended.
Network: 1000Mbps full duplex network card *3
Hard disk zone division recommendation:
C disk: install the operating system, the total capacity of at least 80G or more
D disk: install SMP system and SQL Server database, with a total capacity of at least 200G.
E disk: backup database files, total capacity of at least 200G
The disk format for storing data must be NTFS format.
SMP system dongle
The RG-SMP software relies on the USB dongle to achieve License authorization and control the maximum number of users the SMP system can manage. When the software starts, the system will check whether there is a USB dongle on the server, if the dongle does not exist, the software will automatically stop starting.
The SMP dongle is a hardware product used for software protection on the USB port of the computer, in the shape of a small USB flash drive.
1, collect the license authorization purchased by the customer, confirm that the customer's dongle authorization is sufficient to meet the customer's actual environment and expected demand, such as the SMP system users more than the license authorization, will not be able to continue to add new users.
2、Confirm that the customer's server has a USB port, and the SMP dongle can be inserted normally.
3. Make sure the SMP dongle is inserted before starting SMP service.
4、After the SMP service is started, you need to check the actual SMP authorization information and compare it with the authorization information purchased by the customer, if it is inconsistent, you need to re-burn it through the return process.





Previous:Please crack a virus sample, open immediately my qq on the line, and logged on!
Next:RG-SMP network management service common ports and instructions
The code farmer network, only published in the process of practice, encountered technical difficulties, do not mislead others.
You need to log in before you can post back Log in | Register

This version of the integral rules

DISCLAIMER:
All software, programming materials or articles released by the code farmers network is limited to study and research purposes; the above content shall not be used for commercial or illegal purposes, otherwise, all the consequences please user responsible. This site information from the network, copyright dispute has nothing to do with this site. You must completely remove the above content from your computer within 24 hours of downloading. If you like the program, please support the genuine software, buy registration and get better genuine service. If there is any infringement, please contact us by email to deal with it.

Mail To:help@itsvse.com

QQ| ( ICP备14021824号-2 )|Sitemap

GMT+8, 2024-9-17 14:12

Quick ReplyBack to topBack to list